A-18.1, r. 0.01 - Regulation respecting the sustainable development of forests in the domain of the State

Full text
148. During the construction, improvement or repair of a road, the construction of a power transmission line, the setting up of a piling area, the installation of a forest camp or the setting up or expansion of a sandpit, the trees that have the characteristics indicated in the forestry permit, the sylvicultural prescription or other document authorizing the activity must be harvested.
O.C. 473-2017, s. 148.
In force: 2018-04-01
148. During the construction, improvement or repair of a road, the construction of a power transmission line, the setting up of a piling area, the installation of a forest camp or the setting up or expansion of a sandpit, the trees that have the characteristics indicated in the forestry permit, the sylvicultural prescription or other document authorizing the activity must be harvested.
O.C. 473-2017, s. 148.